An Initial Study for the project was prepared was released on June 14, 2019, with a public review period from June 14, 2019, through July 15, 2019. In accordance with the requirements outlined in Section 15168 of the CEQA Guidelines, the project‐level Initial Study was prepared to disclose the relevant impacts and mitigation measures addressed in the certified program‐level ConnectMenlo EIR and discussed whether the project is within the parameters of the ConnectMenlo EIR or additional analysis would be necessary.
Based on the findings of the Initial Study, a Draft EIR was prepared. The focused Draft EIR, technical appendices, and NOA were released on December 4, 2020. The City accepted comments on the draft EIR through an extended 60-day comment period that ended on February 2, 2021.
The Planning Commission held a Draft EIR public hearing and a general study session on the proposed project at its January 11, 2021, meeting. The City received two comment letters on the Draft EIR. In accordance with CEQA, the City prepared the Final Environmental Impact Report (EIR). The Final EIR for the proposed project does not identify any significant and unavoidable environmental impacts that would result from the implementation of the proposed project. All topic areas either resulted in less than significant impact or would be less than significant with mitigation.
Project environmental documents: