Meta Campus

  • Project typeNon-medical office
Facebook East Campus

The Meta Campus project included two project sites, the East Campus and West Campus. The project was processed in phases, with the East Campus entitlements approved by the City Council in May and June of 2012. The 56.9-acre East Campus is located at 1 Hacker Way (previously 1601 Willow Road) and was formerly occupied by Oracle (previously Sun Microsystems). The site is currently developed with 9 buildings, which contain approximately 1,035,840 square feet. As part of the project approvals in May and June, Meta implemented a vehicular trip cap, which allows approximately 6,600 employees to occupy the East Campus.

The approximately 22-acre West Campus is located at 1 Facebook Way (previously 312 and 313 Constitution Drive). This second phase of the project included the demolition of the existing two buildings and associated site improvements, and the construction of an approximately 433,555 square foot building on top of surface parking.

Location

1 Hacker Way, Menlo Park, CA 94025  View map

Google Map