Changes to inspection scheduling process
Published on June 01, 2022
Please be aware that 1 scheduled trade/item equals a 15-minute inspection. If more time is needed, either schedule the same trade item or multiple trade items to equate the total time needed. For example, if the inspection being called for is ‘Underfloor Roughs’ then schedule underfloor frame, underfloor plumbing, underfloor mechanical to achieve a 45-minute inspection.